US dataswitch to UK
Mechanical Drafters
developing detailed design drawings and specifications for mechanical equipment, checking dimensions of materials to be used and assigning numbers to the materials and designing scale or full-size blueprints of specialty items. If that's your week, this page is about your job.
The honest answer
This job is splitting in two: checking dimensions of materials to be used and assigning numbers to the materials is work AI now does quickly and cheaply, and coordinating with and consulting other workers is work it can't touch.
Which half fills your week decides your exposure. Moving toward the second half is a real, doable plan.
Your week, as this page understands it
Prepare detailed working diagrams of machinery and mechanical devices, including dimensions, fastening methods, and other engineering information. The job title says “mechanical drafters”. The real job is the part underneath: coordinating with and consulting other workers. That is the thing someone has to be right about.
The exposed part of this job is specific, and we won’t pretend it is coming back. But mechanical drafters is not one task. It is 15 scored ones, and they are nowhere near equally exposed. The most durable of them, on this evidence, is coordinating with and consulting other workers, and the ledger below shows exactly why.
Where the work sits, by task weight
- shifting to AI
- 36%
- changing shape
- 32%
- staying human
- 33%
These bars are tasks changing hands, not people being counted out. The ledger below shows which.
Whole-job exposure score 51 out of 100 (45–57 allowing for uncertainty): partial exposure, across 15 scored tasks. The number is the support for the sentence above it, not a headline about anyone’s future.
How we know this
What is measured: Every published task statement for mechanical drafters is rated on five dimensions: can a model produce the output, does the work need a body in a room, does it need a legally accountable person, does it depend on a person being trusted in the moment, and how much data exists. A published formula turns those five ratings into the score; the model never writes the number.
How the bar is built: Each task’s share of the bar is its published importance weight, so a task you do all day counts for more than one you do twice a year.
Release: 2026-q4.1, scores computed 2026-08-05. Read the full method.
Your job, task by task
These are the official task statements for this occupation, in plain English, sorted by what the evidence says is happening to each one. The official wording sits under every line so you can check the rewrite against it.
- 3 of this occupation's scored task statements carry a score that was measured under a different occupation's context, because the statement is shared between jobs and has only been scored once so far. Each one names the occupation it was measured under in the free routes below; none is presented as a measurement for this job.
- Task clusters are not derived in this release, so the task-cluster field is empty and no Collab365 Space routing is attached to this occupation yet.
Shifting to AI
5 tasksTasks today’s tools can already do most of. This is the part we will not soften: where these rows are the bulk of your week, the week changes.
Checking dimensions of materials to be used and assigning numbers to the materials
This is reading one thing and writing another: dimensions of materials in, a record out. That is the shape today's tools are built for.
importance 4 · CoreSource: “Check dimensions of materials to be used and assign numbers to the materials.” (O*NET task statement)
How this row was scored
Exposure score: 93 out of 100 (89–97 allowing for uncertainty): very high exposure, high confidence.
Why it sits in this group: reading one thing and writing another; the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Checking dimensions and assigning part numbers is exact, rule-based work that software does reliably.
The five ratings: output a model can produce 4/4 · needs a body in a room 0/4 · needs an accountable person 0/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Reviewing and analyzing specifications, sketches, drawings, ideas and related data to assess factors affecting component designs and the procedures and instructions
This is reading one thing and writing another: specifications, sketches, drawings in, a record out. That is the shape today's tools are built for.
importance 4 · CoreSource: “Review and analyze specifications, sketches, drawings, ideas, and related data to assess factors affecting component designs and the procedures and instructions to be followed.” (O*NET task statement)
How this row was scored
Exposure score: 66 out of 100 (59–73 allowing for uncertainty): high exposure, medium confidence.
Why it sits in this group: reading one thing and writing another; the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Reading specs and drawings to spot what affects a design is document analysis software handles well.
The five ratings: output a model can produce 3/4 · needs a body in a room 0/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Positioning instructions and comments onto drawings
This is reading one thing and writing another: instructions in, a record out. That is the shape today's tools are built for.
importance 4 · CoreSource: “Position instructions and comments onto drawings.” (O*NET task statement)
How this row was scored
Exposure score: 75 out of 100 (71–79 allowing for uncertainty): high exposure, high confidence.
Why it sits in this group: reading one thing and writing another; the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Adding notes and instructions to drawings is repetitive annotation work that drawing software handles well.
The five ratings: output a model can produce 3/4 · needs a body in a room 0/4 · needs an accountable person 0/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Computing mathematical formulas to develop and design detailed specifications for components or machinery
This is reading one thing and writing another: mathematical formulas in, a record out. That is the shape today's tools are built for.
importance 4 · CoreSource: “Compute mathematical formulas to develop and design detailed specifications for components or machinery, using computer-assisted equipment.” (O*NET task statement)
How this row was scored
Exposure score: 81 out of 100 (77–85 allowing for uncertainty): very high exposure, high confidence.
Why it sits in this group: reading one thing and writing another; the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Running the calculations behind detailed specifications is straightforward for software, with an engineer approving the result.
The five ratings: output a model can produce 4/4 · needs a body in a room 0/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Changing shape
4 tasksTasks where the machine takes the producing and a person keeps the checking, the deciding, or the answering-for-it. For most jobs this is the biggest group, and it is where "transformation, not termination" is literally visible.
Developing detailed design drawings and specifications for mechanical equipment
The software now makes the first pass at detailed design drawings, but the deciding part still needs a person. So the job becomes checking and deciding rather than producing.
importance 5 · CoreSource: “Develop detailed design drawings and specifications for mechanical equipment, dies, tools, and controls, using computer-assisted drafting (CAD) equipment.” (O*NET task statement)
How this row was scored
Exposure score: 50 out of 100 (43–57 allowing for uncertainty): partial exposure, medium confidence.
Why it sits in this group: the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Automated tools help, but turning a design into manufacturing-ready drawings still needs a drafter, and an engineer signs off.
The five ratings: output a model can produce 2/4 · needs a body in a room 0/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Producing three-dimensional models, using computer-aided design, CAD) software
The software now makes the first pass at three-dimensional models, but the deciding part still needs a person. So the job becomes checking and deciding rather than producing.
importance 4 · CoreSource: “Produce three-dimensional models, using computer-aided design (CAD) software.” (O*NET task statement)
How this row was scored
Exposure score: 50 out of 100 (43–57 allowing for uncertainty): partial exposure, medium confidence.
Why it sits in this group: the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Building an accurate 3D model from a design still takes real modeling skill, with an engineer approving it.
The five ratings: output a model can produce 2/4 · needs a body in a room 0/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Laying out and drawing schematic
The software now makes the first pass at and drawing schematic, but the deciding part still needs a person. So the job becomes checking and deciding rather than producing.
importance 4 · CoreSource: “Lay out and draw schematic, orthographic, or angle views to depict functional relationships of components, assemblies, systems, and machines.” (O*NET task statement)
How this row was scored
Exposure score: 50 out of 100 (43–57 allowing for uncertainty): partial exposure, medium confidence.
Why it sits in this group: the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Schematic and orthographic views follow strict conventions software can apply, though laying out a complex assembly still needs skill.
The five ratings: output a model can produce 2/4 · needs a body in a room 0/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Staying human
6 tasksTasks that stay with a person, because they happen in the physical world, because the rules need someone accountable, or because the value is that a specific person does them.
Modifying and revising designs to correct operating deficiencies or to reduce production problems
The ratings behind this row put designs well outside what today's tools can do on their own.
importance 4 · CoreSource: “Modify and revise designs to correct operating deficiencies or to reduce production problems.” (O*NET task statement)
How this row was scored
Exposure score: 33 out of 100 (26–40 allowing for uncertainty): low exposure, medium confidence.
Why it sits in this group: mistakes that are cheap to catch.
The rating behind it: Fixing a design that is causing production problems needs shop-floor knowledge that is not written down.
The five ratings: output a model can produce 2/4 · needs a body in a room 1/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 2/4.
Coordinating with and consulting other workers
The value here is that a specific person handles and consulting other workers and stands behind it. That is earned, not computed.
importance 4 · CoreSource: “Coordinate with and consult other workers to design, lay out, or detail components and systems and to resolve design or other problems.” (O*NET task statement)
How this row was scored
Exposure score: 26 out of 100 (19–33 allowing for uncertainty): low exposure, medium confidence.
Why it sits in this group: the value is that a specific person does it.
The rating behind it: Working problems out with colleagues depends on back-and-forth between people who know the job.
The five ratings: output a model can produce 2/4 · needs a body in a room 1/4 · needs an accountable person 0/4 · needs to be trusted in the moment 2/4 · how much data exists 2/4.
Conferring with customer representatives to review schematics and answer questions pertaining to installation of systems
The value here is that a specific person handles customer representatives and stands behind it. That is earned, not computed.
importance 4 · CoreSource: “Confer with customer representatives to review schematics and answer questions pertaining to installation of systems.” (O*NET task statement)
How this row was scored
Exposure score: 26 out of 100 (19–33 allowing for uncertainty): low exposure, medium confidence.
Why it sits in this group: the value is that a specific person does it.
The rating behind it: Answering a customer's installation questions depends on a live conversation and trust in the answer.
The five ratings: output a model can produce 2/4 · needs a body in a room 1/4 · needs an accountable person 0/4 · needs to be trusted in the moment 2/4 · how much data exists 2/4.
Show the other 5 tasks
Laying out, draw and reproduce illustrations for reference manuals and technical publications to describe operation and maintenance of mechanical systems
shifting to AIThis is reading one thing and writing another: out, draw and reproduce illustrations in, a record out. That is the shape today's tools are built for.
importance 3 · CoreSource: “Lay out, draw, and reproduce illustrations for reference manuals and technical publications to describe operation and maintenance of mechanical systems.” (O*NET task statement)
How this row was scored
Exposure score: 75 out of 100 (71–79 allowing for uncertainty): high exposure, high confidence.
Why it sits in this group: reading one thing and writing another; the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Illustrations for manuals follow set conventions and are largely producible by software.
The five ratings: output a model can produce 3/4 · needs a body in a room 0/4 · needs an accountable person 0/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Designing scale or full-size blueprints of specialty items
changing shapeThe software now makes the first pass at scale, but the deciding part still needs a person. So the job becomes checking and deciding rather than producing.
importance 4 · CoreSource: “Design scale or full-size blueprints of specialty items, such as furniture and automobile body or chassis components.” (O*NET task statement)
How this row was scored
Exposure score: 50 out of 100 (43–57 allowing for uncertainty): partial exposure, medium confidence.
Why it sits in this group: the same decision, made over and over; mistakes that are cheap to catch.
The rating behind it: Blueprints for a specific piece of furniture or car body still need a designer, with engineering approval after.
The five ratings: output a model can produce 2/4 · needs a body in a room 0/4 · needs an accountable person 1/4 · needs to be trusted in the moment 0/4 · how much data exists 3/4.
Supervising and training other drafters
staying humanThe value here is that a specific person handles other drafters and stands behind it. That is earned, not computed.
importance 4 · CoreSource: “Supervise and train other drafters, technologists, and technicians.” (O*NET task statement)
How this row was scored
Exposure score: 21 out of 100 (17–25 allowing for uncertainty): low exposure, high confidence.
Why it sits in this group: the value is that a specific person does it.
The rating behind it: Training junior drafters works through watching, correcting and building confidence over time.
The five ratings: output a model can produce 2/4 · needs a body in a room 1/4 · needs an accountable person 0/4 · needs to be trusted in the moment 3/4 · how much data exists 2/4.
Drawing freehand sketches of designs
staying humanThis work happens in the physical world: freehand sketches of designs, in a real place. Software cannot follow it there.
importance 3 · CoreSource: “Draw freehand sketches of designs, trace finished drawings onto designated paper for the reproduction of blueprints, and reproduce working drawings on copy machines.” (O*NET task statement)
How this row was scored
Exposure score: 8 out of 100 (4–12 allowing for uncertainty): minimal exposure, high confidence.
Why it sits in this group: work that happens in the physical world.
The rating behind it: Freehand sketching, tracing and copying drawings is done by hand at a desk and a machine.
The five ratings: output a model can produce 1/4 · needs a body in a room 3/4 · needs an accountable person 0/4 · needs to be trusted in the moment 0/4 · how much data exists 2/4.
Shading or coloring drawings to clarify and emphasize details and dimensions or eliminate background
staying humanThis work happens in the physical world: drawings, in a real place. Software cannot follow it there.
importance 3 · SupplementalSource: “Shade or color drawings to clarify and emphasize details and dimensions or eliminate background, using ink, crayon, airbrush, and overlays.” (O*NET task statement)
How this row was scored
Exposure score: 0 out of 100 (0–4 allowing for uncertainty): minimal exposure, high confidence.
Why it sits in this group: work that happens in the physical world.
The rating behind it: Shading with ink, crayon and airbrush on paper is manual artwork.
The five ratings: output a model can produce 0/4 · needs a body in a room 4/4 · needs an accountable person 0/4 · needs to be trusted in the moment 0/4 · how much data exists 2/4.
What this job pays, and how many people do it
- Median pay
- $71,550a year, the middle of the range, so half earn more and half earn less.bls-oews, 2025 · May 2025 estimates (national_M2025_dl.xlsx)
How we know this
Source: bls-oews
Reference period: May 2025 estimates (national_M2025_dl.xlsx)
Rounding: Shown as published.
- People doing this job
- 39,960in the US, 2025.bls-oews · May 2025 estimates (national_M2025_dl.xlsx)
What is deliberately not here: a forecast of how many of these jobs exist in ten years. Where an official projection exists for a market we publish it with its vintage; where it does not, we leave the space empty rather than borrow the other country’s number.
Why this is shifting
The reason is boringly specific. Most of what is shifting here is reading one thing and writing another: dimensions of materials in, a record out. The rows above are exactly that shape: checking dimensions of materials to be used and assigning numbers to the materials and reviewing and analyzing specifications, sketches, drawings. What it cannot do is be trusted in person, which is what and consulting other workers run on: someone specific doing it and standing behind it. Which is why this page talks about your tasks changing, not your job ending.
Your move
Over a pint: what I’d tell you if you were my friend
Your week is splitting in two, and which half fills it is the whole question. Checking dimensions of materials to be used and assigning numbers to the materials is going; coordinating with and consulting other workers is not.
So, given all that: 36% of this job's task weight sits in rows the software is already learning, 32% in rows that change shape rather than disappear, and 33% in rows it is nowhere near. That is the position, measured across 15 scored tasks. It is not a forecast about you.
The occupation is an average and you are not, so the first job below is finding out where your own week actually sits.
This week: one thing
Print the task ledger above and put your own hours next to each row. Roughly, in pen, in one sitting. Then look at which group your hours actually pile up in. Twenty minutes, this week.
- What you end up holding
- your own week, on one page, sorted into what is shifting and what is not
- How long it takes
- about twenty minutes
If printing it isn’t practical: Read the rows off this page and write the same list on the back of an envelope. Same twenty minutes, same page, and it works just as well said out loud to someone who knows the job. The point is your hours next to the rows, not the paper it is on.
Over the next 90 days
Volunteer toward the durable end, visibly. Over the next ninety days put your hand up for the work in the bottom group (coordinating with and consulting other workers) and let people see you doing it. Not a new project: the same job, with your mix deliberately tilted. The point is that when the rota or the reorganisation comes, the version of you people picture is the one doing the part that stays.
Over the next 12 months
Claim a specialism at the durable end and let the other end go. Over a year, deliberately become the person who handles coordinating with and consulting other workers, and deliberately stop being the first choice for the rows in the top group. That trade costs something, because the exposed work is often the comfortable work. Decide it on purpose rather than by drift. Before you pay for anything, use CareerOneStop - Find local training. It is free, it is the Labor Department's own service, and it is listed below with the rest of the free routes.
The roads out of here, and why I am not sending you down them
I looked at the obvious moves out of this job, and here is what I found.
I checked the 12 nearest US occupations to mechanical drafters (nearest by the work that AI is not taking, not by job title), and none of them survived. The closest was architectural and civil drafters: only about 17% of its durable work is work you already do. Your own job splits about 36/64: that share of the list sits in the top exposure band and the rest does not. On this evidence the honest move is inside the job rather than out of it. Become the person who owns “develop detailed design drawings and specifications for mechanical equipment, dies, tools, and…”, and let the exposed end go.
How that was checked: this job was compared against all 830 US occupations in this release on their official task statements, and the 12 nearest were examined one by one. A move that turns on an industry, an employer or a qualification rather than on the work itself will not show up in a check like that. And this release carries no licence register, so anything you are weighing needs that looked up separately.
3 moves I checked and rejected
These are the obvious-looking jumps. They are here with their reasons rather than quietly dropped, because the ones that fail are worth knowing about. It is one less thing to turn over at night.
Architectural and Civil Drafters
Why it looked obvious: It came up as a near neighbour on the work AI is not taking: you already supervise and train other drafters, technologists, and technicians, and their equivalent is to supervise and train other technologists, technicians, and drafters. Across both published task lists that is about 17% of the durable work in that job.
Why I am not recommending it: You would be starting most of it from nothing: about 17% of the durable work in that job is work you do today, and the rest you would be learning while the bills carried on.
Electrical and Electronics Drafters
Why it looked obvious: It came up as a near neighbour on the work AI is not taking: you already draw freehand sketches of designs, trace finished drawings onto designated paper for the…, and their equivalent is to reproduce working drawings on copy machines or trace drawings in ink. Across both published task lists that is about 4% of the durable work in that job.
Why I am not recommending it: Almost none of it is work you already do: about 4% of the durable side of that job. That is a different job, not a next step.
Interior Designers
Why it looked obvious: It came up as a near neighbour on the work AI is not taking: you already produce three-dimensional models, using computer-aided design (CAD) software, and their equivalent is to use computer-aided drafting (CAD) and related software to produce construction documents. Across both published task lists that is about 4% of the durable work in that job.
Why I am not recommending it: Almost none of it is work you already do: about 4% of the durable side of that job. That is a different job, not a next step.
What I’d stop worrying about
A friend tells you what not to spend fear on. This is that list.
The headline number you read somewhere
The big “X% of jobs” figures are about the whole economy, not about you. The number that describes your job is on this page: 36% of its task weight, across 15 scored tasks. Every row behind it is printed above with the source. Check ours; ignore theirs.
The whole-job doom story
Nothing on this page says this job ends. It says the mix inside it moves. Half the rows above are unchanged or changing shape, and the plan is about which half your week sits in. That is a very different problem, and a solvable one.
Panic-buying a course
Do the twenty-minute sorting exercise first. Most people who buy a course before they have done it buy the wrong one, and the free services listed below will tell you the same thing without charging for it.
The “obvious” next job everyone suggests
I checked the obvious moves and most of them did not survive. The reasons are printed with the routes above, including the pay and the gate. A move that fails on the numbers is worth knowing about so you can stop turning it over at night.
You are reading the United States figures
The nearest United Kingdom equivalent is CAD, drawing and architectural technicians. It is a close match rather than an identical one: the two countries draw the boundary of the job in slightly different places.
Switch to the United Kingdom page →close match
Your route through this
Where to go next, and what it costs
Free, and complete
The moves above cost nothing. These are the real services that go with them: public, government-funded, and free at the point of use. Nothing on this page is behind an email address or a payment.
Anywhere in the US:
CareerOneStop - Find local training
Search what's running near you, from the Labor Department's own database, before anyone sells you a course.
Free to search; individual programs vary, and some are funded
Anywhere in the US:
An American Job Center will sit down with you for free. Find yours by ZIP code.
Free
Anywhere in the US:
CareerOneStop - Licensed occupations finder
Check what your state actually requires before you pay for anything.
Free
Anywhere in the US:
Free
No Space for this job, but one for what is happening to it
Nothing Collab365 runs is built for mechanical drafters, and we are not going to point you at the nearest one and call it a fit.
There is one that is not about a job title at all. The AI Authority is about being the person who directs these tools at work rather than the person they get compared to. That is worth saying here, because 36% of the work on this page is already inside what they can do.

7 days free, no card needed. Explore up to 2 Spaces before you choose a plan: you pick a plan later, not now.
The AI Authority is a general community about working with AI, not a course for mechanical drafters. You do not need it to act on anything here: the moves above cost nothing and stand on their own. The data on this page is the same either way.
Noted, and thank you. We’ll email you if a Space for mechanical drafters launches. Nothing else.
That did not look like an email address, so nothing was saved. Have another go below.
We could not save that. The fault is ours, not yours, and your address was not stored. Please try again later.
No deadline on any of this. The page will still be here, and the data is refreshed on a published schedule rather than when someone wants a headline.
Questions people ask about this job
- Will AI replace Mechanical Drafters?
- Not as a job, but it is already doing parts of the work. Across the 15 official task statements scored for Mechanical Drafters (United States, SOC 17-3013), 36% of the importance-weighted core work is made of tasks today's AI could already do most of. The overall exposure score is 51 out of 100 (range 45–57, band: partial). That is a statement about tasks, not about headcount: this measures what AI could do, not whether any employer adopts it, whether the law allows it, or whether doing the routine parts faster creates more demand for the human parts. Figures are from release 2026-q4.1.
- Which tasks in “Mechanical Drafters” can AI already do?
- The highest-scoring tasks in release 2026-q4.1 are: “Check dimensions of materials to be used and assign numbers to the materials” (93/100, very high); “Compute mathematical formulas to develop and design detailed specifications for components or machinery, using computer-assisted equipment” (81/100, very high); “Position instructions and comments onto drawings” (75/100, high). Each score comes from five published 0–4 ratings turned into a number by a published formula, and each carries the model's one-sentence reason on the page.
- Which tasks in “Mechanical Drafters” stay human?
- About 33% of this job's task weight sits in work that scores low for AI exposure. The lowest-scoring tasks in release 2026-q4.1 are: “Shade or color drawings to clarify and emphasize details and dimensions or eliminate background, using ink, crayon, airbrush, and overlays” (0/100, minimal); “Draw freehand sketches of designs, trace finished drawings onto designated paper for the reproduction of blueprints, and reproduce working drawings on copy m…” (8/100, minimal); “Supervise and train other drafters, technologists, and technicians” (21/100, low). Low scores usually mean the task needs a body in a room, a legally accountable human, or trust built in real time. Those are the three things the scoring rubric treats as gates rather than obstacles.
- What should someone working in “Mechanical Drafters” do about AI?
- Start from the ledger rather than the headline: 36% of this job's weighted core work is exposed, and roughly 33% is not. The practical move is to spend more of your week on the tasks that score low, the ones above, and to get fluent at directing AI through the tasks that score high, because those are the parts that change whether or not you are ready for them. This page does not predict your job, and nothing here is career advice tailored to you: the score describes the occupation, not the person.
- How is the AI exposure score for Mechanical Drafters calculated?
- Each official task statement for the occupation is rated on five published 0–4 dimensions (output replicability, physical embodiment, licensed accountability, real-time human trust, and data availability) by claude-opus-5 using scoring prompt task_scoring_v1.0. The model never writes the score; a published formula turns the five ratings into a 0–100 number, so every score can be recomputed by hand. The occupation figure is the importance-weighted mean across 15 scored tasks. The prompt, the rubric, the formula and the full dataset are published at https://futureproof.collab365.com/method and https://futureproof.collab365.com/data/2026-q4.1 under CC BY 4.0.
Where these numbers come from
Worth knowing about these figures
- 3 of this occupation's scored task statements carry a score that was measured under a different occupation's context, because the statement is shared between jobs and has only been scored once so far. Each one names the occupation it was measured under in the free routes below; none is presented as a measurement for this job.
- Task clusters are not derived in this release, so the task-cluster field is empty and no Collab365 Space routing is attached to this occupation yet.
- Task statements
- onet-dbProcessing: catalogue-bridge → onet-im-rt-weighting → task-scoring → score-aggregation
- Task weights
- onet-db (im-rt)
- Scores
- Rubric task_scoring_v1.0, model claude-opus-5, computed 2026-08-05.
- Pay and employment
- bls-oews (May 2025 estimates (national_M2025_dl.xlsx))bls-oews (May 2025 estimates (national_M2025_dl.xlsx))
Figures on this page come from release 2026-q4.1, published 2026-08-05. Every release keeps its own permanent address, so a figure you cite in March is still there, unchanged, in November.
The plain-English wording on this page is assembled directly from the task statements and the published ratings, not written by hand for this occupation. That is why it is specific, and it is also why we say so.
The routes and free resources further up are today’s, not the release’s (last reviewed 2026-08-05). A route is an offer, not a historical fact, so it moves on its own clock.
Using these figures?
Cite this
Everything on this site is published under CC BY 4.0. Quote it, chart it, sell something built on it. Just say where it came from, and cite the dated release rather than the site, so the figure you quote stays checkable.
Plain text
Collab365 (2026). Collab365 Futureproof: task-level AI exposure for US and UK occupations, release 2026-q4.1 (methodVersion 2.0.0, promptVersion task_scoring_v1.0). https://futureproof.collab365.com/data/2026-q4.1. Licensed CC BY 4.0. Built with O*NET data (USDOL/ETA, CC BY 4.0); ONS data (Open Government Licence v3.0); GAISI task framework (arXiv:2507.22748, MIT); BLS data (public domain).
BibTeX
@misc{collab365futureproof2026q41,
title = {Collab365 Futureproof: task-level AI exposure for US and UK occupations, release 2026-q4.1},
author = {{Collab365}},
year = {2026},
url = {https://futureproof.collab365.com/data/2026-q4.1},
note = {Release 2026-q4.1, methodVersion 2.0.0, promptVersion task_scoring_v1.0, CC BY 4.0}
}Data as of release 2026-q4.1, published . Releases never change after publication; when the figures move, a new dated release is published beside this one and this one stays exactly where it is.
